I have just added a MPS 400 to my cooling loop. I also have a poweradjust 2 and a aquastream xt.
My question is how can I connect them all via aquabus so they all show up in under the Aquero tab in the Aquasuite (or at least in the poweradjust's case the fans show up).
Obviously I can get them to show up in their own tab via USB but I want them to connect via aquabus. From the little documentation I have found and google, I understand that they all need to be connected to the high speed aquabus on the aquaero. I used to have the Poweradjust and the Aquastream showing up by connecting the poweradjust to the highspeed bus on the aquaero and the pump to the aquabus 2 on the poweradjust.
I don't know if I am missing something simple but I can't work out how to connect all three items to the one bus.
Can anyone help me?
Also on a side note I am using the MPS as a flow meter and am getting a reading of 310L/Hr. This is higher than I was expecting - my loop has 5 blocks it goes through and 1 triple rad and 2 single rads. I have just the one aquastream (I was planning on fitting another until I got this reading - would it make much of an improvement? I am thinking either to put them in series or because of the number of blocks I have to split it into 2 loops?) and have 13mm internal hose. Does this figure seem realistic to people with more experience in this here?